← ProjectsProject
Manki – Mapé bridge
Surfacing of 25.1 km of the Manki – Mapé bridge section on the RN6, including three bridges.
Engineering structureBituminous surfacing of the Manki – Mapé bridge section: 25.1 km of national road 6.
The contract includes three engineering structures: the bridge over the Mvi (120 m), the bridge over the Nkoup (21 m) and the bridge over the Mapé (100 m).



